Engineering of the 2 lane railway bridge near the hotel «Excelsior»

Location

Azerbaijan

The Client is the Ministry of Transport, Communications and High Technologies of Azerbaijan Republic

The engineering of railway bridges is a laborious and lengthy process, requiring considerable time and resources.

The project included:
•    Total length of overpass - 1146 m
•    Tunels (2 nos.) - 80 m, 30 m
•    Railroad bridges - 2 nos.
•    Double-line road, length - 75,85 m, width -11,5 m
•    Double-line road, length - 65,76 m, width - 13,43 m
•    Approach roads - 3300 m, 13 aver. = 16 m
•    Retaining walls   3 10 m
•    Bridge total length – 75.85
•    Bridge overall dimensions – 11.5 m