Engineering of the Ferry terminal at port Kuryk

Location

Kazakhstan

Designing large-scale facilities is our main specialization, and ports are no exception.

Project of the Ferry terminal at port Kuryk included 4 berths in the port, the length of the berth line is 466 m. The maximum parameters of the vessels received are: length - up to 170 m, width - up to 17.5 m. The total design capacity of the ferry complex is 10 million tons per year.

According to the working documentation was carried out:

  • Engineering of a pier for receiving railway ferries and has overal dimensions of 174 m.*13.4m.;
  • Engineering of the eastern and western units with dimensions of 18.2m*17.8m.;
  • Engineering of bored piles for lifting transitional bridges;
  • Engineering of a pier for receiving Ro-Ro car ferries and has dimensions of 174 m.*11.6m;
  • The structure of the quay wall with a cargo platform for a heavy crane has dimensions of 304.4 m.*71m.;
  • Engineering of the eastern protective pier 250m + 33m long;
  • Engineering of the western guard pier with a length of 393m + 33m.

 