Engineering of the bridge over the Samur river

Location

Azerbaijan

Despite the great competition, both among Russian and Azerbaijani companies, the design solutions of the automobile bridge over the Samur River were entrusted to the IC "HYDROTRANS-ENGINEERING".

The new Bridge over the Samur River replaced the previously existing, built in 1953-1957 and put into operation in 1957 as part of the Samur hydroelectric complex, and reduced downtimes in movements.

The bridge over the Samur River - consists of a continuous, monolithic prestressed structure, 5 spans.

Bridge Parameters:

  • Bridge scheme - 54 + 3x69 + 54 m.;
  • The total length of the bridge is 325.3 m.;
  • The size of the bridge for 2-lane traffic on the highway of the II technical category is G-11.5 m.;
  • Full width of the bridge W = 17.3 m.;
  • The bridge is placed on a curve with a radius of R = 600 m.;
  • The length of the bridge with approaches is 812.84 m.