Scroll
Despite the great competition, both among Russian and Azerbaijani companies, the design solutions of the automobile bridge over the Samur River were entrusted to the IC "HYDROTRANS-ENGINEERING".
The new Bridge over the Samur River replaced the previously existing, built in 1953-1957 and put into operation in 1957 as part of the Samur hydroelectric complex, and reduced downtimes in movements.
The bridge over the Samur River - consists of a continuous, monolithic prestressed structure, 5 spans.
Bridge Parameters: