Scroll

Engineering of the bridge over the Hamam-chay River in Ilisu village

Location

Azerbaijan

Client: Azerbaijan Republic «Amelioration and Water Farm» OJSC

Bridge spans designed in the form of a metal arch with top driving.

  • Bridge scheme - 1х56.0m;
  • Total length - 80.5m;
  • Beam total width - 8.5 m.
  • slide
  • slide
  • slide
Hydro

Look other project

Engineering of the bridges and overpasses on Baku-Samur highway at кm 28-89 which is the part of “North-South” Corridor